Meeting of the Clifton to Tangoio Coastal Hazards Strategy Joint Committee

 

 

Date:                        Friday 10 November 2023

Time:                       10.00am

Venue:

Council Chamber

Hawke's Bay Regional Council

159 Dalton Street

NAPIER

 

Agenda

 

Item          Title                                                                                                                                                                         Page

 

1.             Welcome/Karakia/Notices/Apologies

2.             Conflict of Interest Declarations

3.             Confirmation of Minutes of the Clifton to Tangoio Coastal Hazards Strategy Joint Committee held on 22 September 2023

Decision Items

4.             Proposed Terms of Reference amendment                                                                                                3

Information or Performance Monitoring

5.             Follow-up actions update                                                                                                                               13

6.             Hawke’s Bay Climate Change Adaptation Initiatives Stocktake                                                        17

7.             Communications and Engagement Plan update                                                                                     23

8.             Project Manager's update                                                                                                                              27

9.             Current coastal projects update                                                                                                                   31

 


Clifton to Tangoio Coastal Hazards Strategy Joint Committee  

Friday 10 November 2023

Subject: Proposed Terms of Reference amendment        

 

Reason for report

1.     This agenda item provides an opportunity for the Joint Committee to consider and approve minor proposed amendments to its Terms of Reference.

Background / Discussion

2.     At the last meeting of the Joint Committee on 23 September 2023 the paper Hawke’s Bay Climate Change Adaptation Initiatives Stocktake presented a stocktake of current climate change adaptation initiatives and projects across the Councils to capture current work and interconnectivity.

3.     This stocktake was presented in connection with an earlier discussion about the Joint Committee’s Terms of Reference, noting that it currently includes tsunami as within scope for the Strategy.

4.     As a result of the stocktake exercise and discussion with the Joint Committee, staff recommended that the Joint Committee’s Terms of Reference would benefit from a minor change to Appendix 1 to provide clarity and confirm its approach to consideration of tsunami and other coastal hazards.

5.     The Joint Committee confirmed its desire to provide that clarification and requested that their Terms of Reference be brought back with the proposed changes for their consideration and approval.

6.     Accordingly, provided as Attachment 1 to this paper are the Joint Committee’s Terms of Reference with proposed tracked changes shown in Appendix 1.

7.      It is noted that any changes to the Terms of Reference require agreement by all Joint Committee members, as set out in clause 15.2. 

8.      Any amendments agreed to by the Joint Committee today will be provided to each Partner Council for adoption in accordance with the Local Government Act processes that apply to Joint Committees.

Financial and Resource Implications

9.      There are no financial or resource implications from the proposed changes to the Terms of Reference.

Decision Making Process

10.    Council and their committees are required to make every decision in accordance with the requirements of the Local Government Act 2002 (the Act). Staff have assessed the requirements in relation to this item and have concluded:

10.1.     Councils are required to (LGA sch.7 cl.19(1)) hold the meetings that are necessary for the good governance of their district or region

10.2.     Councils may appoint (LGA sch.7 cl. 30(1)(a)) the committees, subcommittees, and other subordinate decision-making bodies that they consider appropriate, including joint committees

10.3.     Given the provisions above, the Joint Committee can exercise its discretion and make these decisions without consulting with the community or others having an interest in the decision.

 

 

Recommendations

That the Clifton to Tangoio Coastal Hazards Strategy Joint Committee:

1.      Receives and considers the Proposed Terms of Reference amendment report.

2.      Agrees that the decisions to be made are not significant under the criteria contained in Hawke’s Bay Regional Council’s adopted Significance and Engagement Policy, and that the Joint Committee can exercise its discretion and make decisions on this issue without conferring with the community, in the form of recommendations to the partner councils for confirmation.

3.      Accepts the Terms of Reference (attached) including amendments agreed today.

4.      Recommends the Terms of Reference agreed today to each of the Partner Councils for adoption.

Authored by:

Simon Bendall

Coastal Hazards Strategy Project Manager

 

Approved by:

Chris Dolley

Group Manager Asset Management

 

 

Attachment/s

1

2023 proposed Clifton to Tangoio Coastal Hazards Strategy Joint Committee ToR

 

 

  


2023 proposed Clifton to Tangoio Coastal Hazards Strategy Joint Committee ToR

Attachment 1

 

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator


Clifton to Tangoio Coastal Hazards Strategy Joint Committee  

Friday 10 November 2023

Subject: Follow-up actions update        

 

Reason for Report

1.     This item tracks items raised at previous meetings that require action. A list of outstanding items is prepared for each meeting, including who is responsible for each, when it is expected to be completed and a brief status comment.

2.     Once the items have been completed and reported to the Committee they will be removed from the list.

Decision Making Process

3.      Staff have assessed the requirements of the Local Government Act 2002 in relation to this item and have concluded that, as this report is for information only, the decision-making provisions do not apply.

 

Recommendation

That the Clifton to Tangoio Coastal Hazards Strategy Joint Committee receives and notes the Follow-up actions update.

 

Authored by:

Simon Bendall

Coastal Hazards Strategy Project Manager

 

Approved by:

Chris Dolley

Group Manager Asset Management

 

 

Attachment/s

1

Actions from previous meetings

 

 

  


Actions from previous meetings

Attachment 1

 

PDF Creator


Clifton to Tangoio Coastal Hazards Strategy Joint Committee  

Friday 10 November 2023

Subject: Hawke’s Bay Climate Change Adaptation Initiatives Stocktake         

 

Reason for Report

1.      This report presents a high-level overview of council-led climate change adaptation initiatives relevant to the work of the Joint Committee.

Background

2.      At the 11 August 2023 meeting of the Joint Committee, a question was asked about the Joint Committee’s Terms of Reference, noting that it currently includes tsunami as within scope for the Strategy.

3.      In 2015, work under the Strategy modelled tsunami hazards and risks (alongside coastal erosion and coastal inundation). Following this work, the Joint Committee determined that it would focus on coastal erosion and coastal inundation, as tsunami was primarily considered a civil defence matter. However, the Joint Committee’s Terms of Reference were not changed at that time.

4.      Since then, tsunami modelling has been updated and further work undertaken through the Hawke’s Bay Civil Defence and Emergency Management (CDEM) Joint Committee.

5.      During the discussion at the 11 August Joint Committee meeting, it was noted that the Technical Advisory Group (TAG) was working on a scan or stocktake of current climate change adaptation initiatives and projects across the councils in order to better capture current work and interconnectivity. It was requested that an update on this work be presented to the Joint Committee for information and discussion in relation to the Terms of Reference and any changes the Joint Committee may wish to make.

6.      The current output of this stocktake exercise is provided as Attachment 1. The following limitations and assumptions are noted:

6.1.       This is a preliminary outcome, presented in draft for Joint Committee information.

6.2.       The stocktake does not yet include initiatives or activities undertaken by Central Hawke’s Bay or Wairoa District Council.

6.3.       Climate change adaptation is occurring through most activities of the councils (e.g. financial planning, asset management planning, reserves planning, RMA processes, etc.) and across a significant number of discrete projects. For practical purposes, at this stage the stocktake has been limited to core governance structures and projects that are relevant to coastal adaptation.

Discussion

7.      While preliminary, this exercise has highlighted the broad range of initiatives and projects currently underway. In some cases, it may be beneficial to improve coordination of work programmes and interconnectivity.

8.      With respect to the Joint Committee’s discussion on whether tsunami should remain in their Terms of Reference or not, the following points are noted:

8.1.       Currently, the tsunami work is being led through the CDEM Joint Committee. It has not been contemplated by the community panels established for this Strategy or this Joint Committee, beyond the initial hazard and risk work in 2015.

8.2.       There are additional natural hazards (such as ground water, river flooding and others) that are significant for coastal areas but are not currently included in the Strategy. This reflects an early decision of the Joint Committee where it determined the hazards in scope for this iteration of the Strategy. The current approach is to build in additional hazard information and adjust the Strategy if required through future reviews and as more information (data, modelling, etc.) becomes available. Developing effective multi-hazard risk assessments will be an important future initiative and is the subject of developing and evolving practice and research.

8.3.       There is a minor disconnect between the Strategy that is being developed, and the Joint Committee’s Terms of Reference. Specifically, in Appendix 1 Project Background (under the heading Project Scope) it notes that the Strategy will respond to “the risks posed by the natural hazards of coastal erosion, coastal inundation and tsunami.

Next steps

9.      It is recommended that the Joint Committee’s Terms of Reference would benefit from minor changes to provide clarity and confirm its approach to consideration of tsunami and other coastal hazards. This could be achieved through a minor update to Appendix 1 to confirm:

9.1.       That the current focus for the Strategy is on the priority hazards of coastal erosion and coastal inundation, and

9.2.       That future reviews of the Strategy will consider new information on additional hazards and multi-hazard assessments.

10.    It is also suggested that TAG considers opportunities for increased interconnectivity across the various governance structures identified in Attachment 1 to ensure that the Strategy is effectively positioned within a broader programme of climate change adaptation initiatives. Further discussion on this opportunity is welcomed at the meeting.

Decision-making Process

11.    Staff have assessed the requirements of the Local Government Act 2002 in relation to this item and have concluded that, as this report is for information only, the decision-making provisions do not apply.

 

Recommendation

That the Clifton to Tangoio Coastal Hazards Strategy Joint Committee receives and notes the Hawke’s Bay Climate Change Adaptation Initiatives Stocktake staff report.

 

Authored by:

Simon Bendall

Coastal Hazards Strategy Project Manager

 

Approved by:

Chris Dolley

Group Manager Asset Management

 

 

Attachment/s

1

Preliminary HB Climate Change Adaptation Initiatives Stocktake findings

 

 

  


Preliminary HB Climate Change Adaptation Initiatives Stocktake findings

Attachment 1

 

PDF Creator

PDF Creator

PDF Creator


Clifton to Tangoio Coastal Hazards Strategy Joint Committee  

Friday 10 November 2023

Subject: Communications and Engagement Plan update        

 

Reason for Report

1.      This report discusses the communications and engagement plan for the period October 2023 – July 2024.

Background

2.      Over the past two years there has been regular but fairly low levels of community engagement as the Strategy development process tracks towards a formal consultation process.

3.      Engagement activity has included a community survey and letter box drop, two community drop-in sessions, newsletters, and a workshop series which included participation by former community panel members.

4.      With the Strategy consultation process now deferred to August 2024, and in acknowledgement that this is a complex project that will succeed with broad community support, a plan is required to guide engagement activity in the lead up to the formal consultation process.

Discussion: Communication and Engagement Plan 2023-24

5.      A communications and engagement strategy has been developed to support reconnecting with the community over the next year in the lead up to formal Strategy consultation.

6.      This Joint Committee paper outlines the key strategic components of the Strategy for discussion with the Joint Committee. This covers objectives, audience, strategic approach, key messages, and campaign approach. Discussion is provided under these headings in the following paragraphs. 

7.      The full operational detail of the plan itself has not been attached to this paper. This is because the plan is detailed, a fluid ‘living’ document that will change over time as engagement occurs, and lists individual groups.

8.      In support of this paper, there will be a presentation during the Joint Committee meeting to further explain the plan, the thinking behind it, and detail the innovative engagement options available.

Objectives

9.      There are three objectives for this plan:

9.1.       Maintain and increase community understanding of, interest in, and build buy-in to the coastal hazards mahi.

9.2.       Enable and facilitate meaningful engagement with communities using effective and innovative approaches.

9.3.       Align with and complement engagement activities occurring through the Mātauranga Māori workstream.

Audience

10.    An audience analysis exercise was undertaken with Technical Advisory Group (TAG) members who work closely with different sectors of the community in relation to coastal hazards. Analysis was carried out to identify who all the groups are and how engagement should be tailored for each group.

11.    The key purpose for this analysis is to ensure that we are reaching the right people and groups, while also managing limited resources by targeting engagement in the most effective way.

12.    The audience list is extensive and is likely to change over time as engagement identifies further interested groups, and engagement effort responds to identified needs.

13.    The below table shows a simplified version of the analysis.

Audience

How we’ll engage

Tangata whenua

TBC, to be developed working with Mātauranga Māori workstream

Councillors (HBRC, JC, NCC, HDC, RPC, MC)

Direct engagement through council meetings

Coastal communities

Newsletters, community meetings, social media, media, website

Environmental groups

Direct engagement, newsletters, community meetings, social media, media, website

Coastal businesses

Industry groups, newsletters, community meetings, social media, media, website

MPs

Direct engagement

Coastal schools

Direct engagement, newsletters, community meetings, social media, media, website

Lifelines

Direct engagement, newsletters, community meetings, social media, media, website

Council staff

Direct engagement, social media, media, website

Recreational users

Newsletters, community meetings, social media, media, website

Industry groups

Direct engagement, newsletters, community meetings, social media, media, website

Tourism sector

Newsletters, community meetings, social media, media, website

Ministers (Civil Defence, Local Government, Climate Change)

Social media, media, website

 

Strategic Approach

14.   The strategic approach of the engagement plan focuses on three parts to support the objectives:

14.1.     Build trust - the Strategy and councils are seen to be doing what they say they will, put the community first, and take action to respond to coastal hazards.

14.2.     Make this relevant and build buy-in – the causes and impacts of coastal hazards and the proposed responses through the Strategy are made relevant and understandable.

14.3.     Drive participation and partnership – the community gets involved and inputs into the Strategy for coastal hazards.

Key messages

15.    Key messages have been developed and grouped into three buckets:  why, how, and what.

 

Key message one: Why we’re here

16.    Hawke’s Bay’s coast is a part of us, a place where we live, play, or work.

17.    Our way of life along the coast is being challenged by climate change, with our communities being impacted more and more by coastal erosion, sea level rise, and flooding by the sea (inundation).

18.    The sea level in HB is expected to rise by 30cm by 2050, and could be over 1m by 2120.

19.    We’re already living through what this means for our community with houses damaged, insurance costs increasing, assets requiring repair, and roads being damaged.

20.    These impacts will continue and will increase over time.

21.    We need to support Hawke’s Bay’s coastal communities, businesses and key infrastructure to be resilient to hazards and be able adapt to the changing climate.

Key message two:  How we’ve developed a plan to manage coastal hazards

22.    We can’t solve the challenges along our coast with one solution, and it might seem complex and too big a task to solve.

23.    As the area of HB coast with the most communities and businesses, we’ve been working on a plan to respond to coastal hazards between Clifton and Tangoio. We plan to roll this approach out to other parts of the coast in the future.

24.    The Clifton to Tangoio Coastal Hazards Strategy 2120 is a collaboration between tangata whenua and three councils, Hastings District, Napier City, and Hawke’s Bay Regional Council.

25.    We’ve worked closely with key members of the community and experts using what we already know, community experiences, and scientific data to look at our current levels of risk from coastal hazards and how these risks could be managed over the next 100 years.

26.    The Strategy identifies the areas that may be affected by coastal hazards over the long term and the associated risks, and sets out pathways for managing these risks, creating more resilient coastal communities.

27.    In reality, the solutions to these problems are quite limited, and different locations will require different solutions. We can avoid making the problem worse by building away from hazard-prone areas, protect where we are through renourishing beaches or building sea defences, accommodate risk through design (e.g. increased floor levels), or retreat away from the coastline.

Key message three: How we’re going to turn this into action

28.    We need to work with our community to make this plan part of the Hawke’s Bay Regional Council’s Long-Term Plan so it can be implemented.

29.    We need to communicate with our community about the options set out in the plan for managing coastal risks over the next 100 years. We also need to check with the community how we’ll pay for it, looking at how we rate different property owners based on where they live and how much they will benefit from the work.

30.    Sea level rise and increasing inundation and erosion is inevitable so we can’t sit back and do nothing.

31.    The more we do to build climate change resilience into our coast now, the more options we will have to meet the challenges later.

32.    Let’s make this plan a reality and give our tamariki and mokopuna a coast they can continue to enjoy.

 

Campaign approach

33.    The campaign approach is split into two sections:

33.1.     There will be ongoing communications throughout the year (now-July 2024) using newsletters, web content, case studies, videos, social media, and media releases as the foundation for engaging the community.

33.2.     For the pre-engagement period (May-June 2024), there will be key opportunities planned to engage harder to reach communities kanohi ki te kanohi.

34.    The list below shows the key engagement tools proposed by the plan which focus on building trust, making it relevant and building buy-in, and driving participation and partnership. The presentation will go into more detail about the different tools and techniques.

34.1.     Video (council case studies alongside community voices)

34.2.     Media (releases and opinion pieces)

34.3.     Advertising (paid)

34.4.     Social media (using HBRC, NCC, HDC and other partner and community channels)

34.5.     Community champions

34.6.     Events (tailored or going to where the community are)

34.7.     Container (movable information)

34.8.     Survey.

Next Steps

35.    With any feedback from the Joint Committee, TAG will commence implementing the communications and engagement plan, including planning for consultation pre-engagement.

36.    Reporting at each Joint Committee meeting will be provided to update on engagement activities and outcomes.

37.    In addition, Joint Committee members will be advised of key engagement activities by email, so they have the opportunity to participate.

Decision-making Process

38.    Staff have assessed the requirements of the Local Government Act 2002 in relation to this item and have concluded that, as this report is for information only, the decision-making provisions do not apply.

 

Recommendation

That the Clifton to Tangoio Coastal Hazards Strategy Joint Committee receives and notes the Communication and Engagement Plan 2023-24 update.

 

Authored by:

Rebecca Ashcroft

Consultant Frank Engagement

Simon Bendall

Coastal Hazards Strategy Project Manager

Approved by:

Chris Dolley

Group Manager Asset Management

 

 

Attachment/s

There are no attachments for this report.


Clifton to Tangoio Coastal Hazards Strategy Joint Committee  

Friday 10 November 2023

Subject: Project Manager's update        

 

Reason for report  

1.      This report provides an update on project-related matters including timeframes, budgets and tracking towards milestones.

Project Dashboard

2.      The following project dashboard (Table 1) is provided to summarise current project status for budget, timeline and all eight Strategy Workstreams (WS). An assessment of each project element is made on a ‘traffic light’ basis, with a brief commentary provided to explain the rating given.

3.      Where a rating has changed from the preceding report, the metric is shown in red underline with an arrow showing the change in status.

Table 1: Project Dashboard Report: November 2023

 Status:

On Track

 

Under Stress

Key Risk

 

Metric

Status

Commentary

Project Budget

 

 

Pause and delay to Strategy notification in response to Cyclone Gabrielle has led to project budget being underspent in 2022/2023 financial year. Partner councils have agreed to carry forward unspent funds into 2023/2024. 

Project Timeline

 

 

New August 2024 target for notifying proposed Strategy on track to be achieved. However, continued delay in progressing Strategy presents challenges and uncertainty for communities experiencing ongoing effects from coastal hazards.

WS1: Funding / Governance

 

 

Funding model is most significant and challenging task to complete in order to produce a complete Strategy - external expertise engaged to assist with development process. Funding Group of TAG formed and have held workshops recently to progress. Work underway and on track.

WS2: LGA Consultation

 

 

LGA Consultation now taking place in 2024. 

WS3: Comms & Engagement

 

 

HBRC Comms team has previously supported Strategy Communications and Engagement. HBRC resource limitations prompted TAG to seek external resources which have now been secured. Comms and engagement plan now developed and progressing to implementation.

WS4: Design

 

 

Substantially complete – no significant additional design work required prior to Strategy notification.  Note very limited internal resources available.

WS5: Mātauranga Māori

 

Workstream scope confirmed by Joint Committee in September 2022. External contractor engaged to provide expertise and capacity. Project plan developed and workshopped with TAG recently. HBRC Māori Committee and Regional Planning Committee briefings undertaken in August 2023. Work underway with initial hui being held.  Working through the critical outcomes required for strategy notification some uncertainty about engagement process. Uncertain progress has led to change in status.

WS6: Coastal Ecology

 

 

Draft coastal ecology monitoring plan has been received by TAG and has been reviewed by HBRC science team. Mana Whenua engagement sought to expand / refine monitoring plan.

WS7: Regulatory

 

 

Limited progress in last six months. National regulatory framework uncertain post-elections. Work in progress with internal resources.

WS8: Signals and Triggers

 

 

Thresholds development process completed. TAG has assessed the development of signals and triggers and has determined to pause further work until the Strategy has been adopted with confirmed thresholds. Workstream currently on hold.

 

4.      There has been a status change for the Mātauranga Māori workstream to highlight that progress has been slow and the need to ensure meaningful and effective engagement occurs and is able to directly inform this strategy development process.

Central Government Update

5.       Following discussion at the last Joint Committee meeting, a submission on Parliament’s Environment Committee Komiti Whiriwhiri Take Taiao inquiry into climate adaptation has been lodged for the Joint Committee.

6.       The submission was a culmination of input from staff from the three partner councils and from Joint Committee member reviews. The final copy of the submission was circulated to Joint Committee members by email on 1 November2023.

7.       While there was insufficient time or capacity to respond to all matters of interest for the inquiry, a request has been made to present to the Environment Committee in support of the submission. This will provide further opportunity to expand on the submission points made. TAG will keep the Joint Committee updated on any responses or updates regarding this inquiry.

8.       As noted verbally at the last Joint Committee meeting, the proposed National Policy Statement for Natural Hazard Decision-Making (NPS-NHD) has recently been released for public submissions:

https://environment.govt.nz/publications/proposed-national-policy-statement-for-natural-hazard-decision-making-2023/

9.       The NPS-NHD is intended to ensure that local government considers the risk of all natural hazards (including the effects of climate change) when making decisions relating to all new developments. The NPS-NHD would only apply to new resource consents. This means it would not affect existing resource consents, existing use rights and activities currently permitted in district and regional plans.

10.     The submissions period ends on 18 November 2023.

11.     TAG is currently considering potential content for a submission and welcome Joint Committee feedback on their wishes to engage in this consultation process.

Decision Making Process

12.    Staff have assessed the requirements of the Local Government Act 2002 in relation to this item and have concluded that, as this report is for information only, the decision-making provisions do not apply.

 

Recommendation

That the Clifton to Tangoio Coastal Hazards Strategy Joint Committee receives and notes the Project Manager’s update.

 

Authored by:

Simon Bendall

Coastal Hazards Strategy Project Manager

 

Approved by:

Chris Dolley

Group Manager Asset Management

 

 

Attachment/s

There are no attachments for this report.  


Clifton to Tangoio Coastal Hazards Strategy Joint Committee  

Friday 10 November 2023

Subject: Current coastal projects update        

 

Reason for Report  

1.      This report provides an opportunity for the Technical Advisory Group (TAG) to update the Joint Committee on various coastal projects that members have expressed an interest in keeping abreast of.

Rangatira Revetment

2.      Construction of the wall is now completed.

3.      We are working with the NCC reserves manager to complete the new footpath and garden areas on the backside of the wall. This is aimed at completion in the next 2-3 weeks.

4.      Please note: no plants will be planted this side of Christmas due to high winds and an indicated hotter summer.

5.      A site blessing will be completed towards the end of this month.

6.      It is noted that clause 7.5 of the Coastal Hazards Memorandum of Transition (MOT) requires consultation with HBRC for any new coastal hazards assets not listed in the MOT. In accordance with this clause, a letter was sent by Napier City Council’s Chief Executive to HBRC on 9 November 2022.

Westshore resource consent renewal 

7.      This work package is to secure a new consent for the renourishment of Westshore Beach that expires in 2027.

8.      Due to Cyclone Gabrielle response and ongoing recovery works, staff availability has been limited and therefore this work package has not progressed.  Emergency renourishment works after the Cyclone Gabrielle and during July / August 2023 have been completed.

9.      Discussions have been held with NCC regarding the alignment of the gravel bund and the option to extend the rock armouring of the Rangatira sea wall.

10.    Next step is to undertake and complete the review of the beach renourishment works. The review of the beach renourishment works is planned to commence in the next month. Commencement of the annual survey for the renourishment works.

11.    Consent costs will vary depending on what type of works will be considered in the future.

11.1.  Costs associated for the continuation of the beach renourishment option will be similar.

11.2.  For the construction of a structure on the foreshore (i.e. groynes or rock revetment) the consent requirements will increase due to additional engineering and environmental investigations and consultation will be required.  For comparison, an initial cost estimate of $1.4M has been received, for the extension of the rock armouring (79m) to the Rangatira sea wall. 

12.    On completion of the beach renourishment works review, the consenting costs for the preferred option will be able to be better defined.

 

 

Haumoana Shingle Crest Height

13.    No work is currently being undertaken on replenishment of the Te Awanga to Haumoana shingle crest. It is proposed to hold further discussions between HDC and HBRC on possible consent condition reviews and access to gravel for replenishment activities.

Haumoana 18

14.    There has been no recent interaction between HDC and the H18 residents during this period.

Maraetotara River at Te Awanga 

15.    Damage to the foreshore adjacent to the Maraetotara River at Te Awanga was caused by floodwaters from the Cyclone. This damage left some properties at risk from water intrusion from high seas. A public meeting was held within the community on 26 April 2023 to discuss possible solutions and how they might be funded.

16.    The Heretaunga Recovery Plan includes for consideration, a proposed action to construct a revetment to repair damage to the Maraetotara River channel in order to increase the resilience of the area to future weather events and protect homes in Wellwood Terrace and Kuku Street.

17.    Further erosion and sea water intrusion occurred on 10 July 2023 in the Te Awanga lagoon area, with some metres of erosion to a 200m section of coast, impacting the beach access and parking area, as well as causing power outages. Since this time there has been a replenishment of gravel to this area that has given some immediate respite to the problem but needs ongoing monitoring.

18.    A meeting was held with representatives of the Haumoana, Te Awanga and Clifton area, along with HBRC and HDC Councillors and staff on the 12 September 2023, discussing a number of coastal related issues in the area, including the Te Awanga Lagoon area. A number of actions have been documented and a follow up email has been provided which clarifies current levels of understanding and advice as to a possible way forward, with focus on using the next LTP process for any substantive progress. RMA Emergency provisions are still a fallback option should circumstance change, requiring more immediate intervention.

Whirinaki

19.    HDC Council staff have continued to engage with North Shore Road representatives as the erosion problems in this area are aggravated by recent cyclone and sea events.

20.    The Cyclone Gabrielle event has caused a greater level of damage to the coastline immediately north of North Shore Road and to a section at the Esk River end of North Shore Road. The section of road near the Esk River section has required a response from the HDC roading section and has involved the placement of limestone rock as foundation and protection works along with backfilling and reinstatement to road level. This work was carried out as part of emergency works associated with the Cyclone. Further investigations are required to determine the next steps for the northern section.

21.    The erosion to the north of North Shore Road has eroded the access track, back into private property, and residents are seeking advice and assistance to address this issue. The Esk/ Whirinaki Resilience project, part of responding to Cyclone Gabrielle, is considering flood protection and river mouth management options, that could have relevance to the North Shore Road area and there may be an opportunity to consider how these areas could work together.  

 

 

Coastal Inundation Assessment Project update 

22.    The report will be workshopped with staff from NCC and HDC on 22 November 2023 and an update will follow. 

Hawke’s Bay Climate Action

23.   The Climate Action Joint Committee hosted a workshop for all governors and TAG members on 6 October 2023, facilitated by Karl Wixon, Arahia.

24.   The purpose of the workshop was for governors and TAG members to get to know each other better, to understand the skill set in TAG, and to begin developing a vision for 2050 resilience.

25.   While this vision is being developed, all work on regional climate risk assessment and emissions reduction is paused.

26.   The next meeting of the Climate Action Joint Committee is on 4 December 2023.

Decision-making process

27.    Staff have assessed the requirements of the Local Government Act 2002 in relation to this item and have concluded that, as this report is for information only, the decision-making provisions do not apply.

 

Recommendation

That the Clifton to Tangoio Coastal Hazards Strategy Joint Committee receives the Current coastal projects update.

 

Authored by:

Simon Bendall

Coastal Hazards Strategy Project Manager

 

Approved by:

Chris Dolley

Group Manager Asset Management

 

 

Attachment/s

There are no attachments for this report.